Areal Frey, 4612 Wangen b. Olten, Switzerland

Published:

FACILITY
The former Frey clothing factory has been carefully renovated and repurposed. A mix of living and working, leisure and culture has been created.
Due to the staggered construction phases, the heat generation was realized in two phases. The UTSL 200 pellet heating system was replaced in the second phase with the newer
the newer UTSD 240/200 version. Using cascade control, the boiler are operated according to demand and with even running times.
operated. The common collective ash removal is fully automatic.


area of application
Heat generation and hot water preparation for two residential buildings, offices and commercial premises.


HEATING ROOM
The existing concrete basement rooms were converted into a boiler room, adapted to fire protection regulations (EI60) and equipped with a pellet store.
pellet store.


fuel
Pellets


SPECIAL FEATURES
An increase in output of up to 110 kW is possible with the boiler . This means that a higher heat requirement can be covered without any problems.