Various references at a glance

  • 2 Schmid UTSR furnaces heat the Uster hospital from the Uster Nord heating network.

    Modern energy center in the new hospital in Uster, Switzerland

    Modern energy center in the new Uster hospital General information Energie Uster AG moves and animates the city of Uster reliably and safely with electricity, gas, water and heat. The products are continuously adapted to the market and customer needs as well as to national, cantonal and...

  • Innvik, Norway

    Climate-neutral production line for sustainable furniture textiles made from natural fibers General information Innvik is one of Scandinavia's leading manufacturers of high-quality furniture textiles. In collaboration with interior architects and furniture designers, special designs are created and the fabrics are produced accordingly. Sustainability plays an important...

  • Waermeverbund-greifensee-UTSR-visio-Schmid woodchip heating

    Unholz Wärme AG, Greifensee heating network, Switzerland

    Faithful and reliable companion - Schmid Heizungen Faithful and reliable companion - Schmid Heizungen The first heating center was installed back in 1985 - a Schmid boiler with 500 kW and a Wood chips warehouse right next door. With this central heating system the...

  • Schmid-UTSK-distance-heating-for-beach-hall-by-wood-construction-shop

    Bösch AG Joinery, Amriswil, Switzerland

    Traditional company relies on district heating General information Bösch AG is a traditional Thurgau company and has been manufacturing windows from local woods for over 100 years. Detailed fabrications as well as various carpentry works are part of the manifold competences of Bösch AG. In October...

  • A man places a log in the open filling chamber of the Novatronic XV log heater from Schmid.

    Marty, 8852 Altendorf, Switzerland

    FACILITY Organic farm, animal husbandry, fruit and arable farming. Renovation of an existing lump wood furnace in the residential house with energy storage. It quickly became clear that with the new generation XV, the existing energy storage system no longer provided the necessary comfort and a storage expansion...

  • In a boiler room, a man is standing in front of a Novatronic XV product type log heater on the left and two storage tanks are on the right.

    Baumann, 3262 Suberg, Switzerland

    PLANT At the home of organic farmer and National Council member Kilian Baumann, the new Novatronic XV 55/35 with automatic ignition provides the soothing heat. To use the generated energy as efficiently as possible, the existing storage system was expanded by two additional 1,000...

  • In a boiler room, on the left, there is a lump-wood heating system of the Novatronic XV product type, and on the right, the control screen is visible.

    Lüthi, 3400 Burgdorf, Switzerland

    PLANT The Novatronic XV 80/50 lump wood furnace with automatic ignition and heat exchanger cleaning provides heating comfort for the Lüthi family. The simple operation of the boiler is particularly appreciated. Since a lump wood combustion system was already in use before, the...

  • Owner Mr. Schuwey stands in front of his Schmid UTSD firing system. The fuel is transported from production to the silo via a suction system.

    Schuwey joinery, 1655 Im Fang, Switzerland

    PLANT The existing heating plant no longer reached the emission limits according to LRV. The existing fuel - a mixture of chips, Wood chips and sawdust - requires optimal combustion and fine regulation of the heating system. With the new heating boiler...

  • In a boiler room, a wood chip heater of the product type UTSD E-Clean is located on the left and the fuel Wood chips  is visible on the right.

    Landhaus sports hall, 9053 Teufen, Switzerland

    CUSTOMER The municipality of Teufen operates the 3-fold sports hall with changing rooms, office, 2 theory rooms, foyer, gymnastics and weight room for the school and clubs. The sports hall is the meeting point for athletes but also cultural events and connects people...

  • At Werkhof Kirchzelg, a Schmid UTSR system heats the workshop, the offices and an apartment.

    Kirchzelg depot, 5430 Wettingen, Switzerland

    PLANT At the Werkhof in Wettingen, the existing Schmid woodchip heating system had to be replaced due to its age. Convinced by the Schmid product, the decision was made in favor of the new UTSD. Since the existing Schmid moving floor and the collecting screw were still perfectly intact, the...